A draft Texas PUC order has been posted which would include revised conditions meant to protect ERCOT ratepayers from costs arising from the City of Garland’s Rusk-to-Panola Double-Circuit 345-kV line, which is to facilitate the export, via DC Tie, of ERCOT power via the Southern Cross Transmission line (Docket 45624)