SMU seismologist Heather DeShon suggests that the Texas Railroad Commission begin collecting daily injection volumes and pressure from operators of natural gas drilling. Without that data, it’s difficult to determine the limits under which wastewater disposal wells might be operated safely, without reawakening faults.

Keep reading at D Magazine.