Nov. 2 — The development of dispatchable capacity – 510 MW of gas-fired generation and more than 354 MW of battery storage – would tend to address the Public Utility Commission of Texas’ repeated concern that ERCOT needs more dispatchable generation to be able to back up all of the renewable power being added to the state’s fleet.

— Keep Reading